Equipping Al-Hartha power station with specialized steel plates from China
Managing the Plate Curtain Steel supply chain from the People's Republic of China to Al-Hartha power station, including conformity inspection to Chinese standards before shipment — boosting the station's capacity and southern power supply.
Project data
- Location
- Al-Hartha power station, Basra
- Completion year
- 2022
- Status
- Completed and handed over
- Material
- Plate Curtain Steel
- Country of origin
- People's Republic of China
- Inspection
- Conformity inspection to Chinese standards, pre-shipment
- Completion certificate
- Available on request
The completion certificate is available on request for prequalification purposes.
Site photography
We do not display generated imagery, and we do not display photographs of projects that are not ours. Photographs of this project will be added from the site archive once documented with date and location.
The documented record
Site photographs for this project are still being gathered from the archive. In the meantime the reference that actually settles a prequalification is the stamped completion certificate — a verifiable document, not an image — and it is available on request.
- Completion year
- 2022
- Status
- Completed and handed over
- Completion certificate
- Available on request
The challenge
Specialized material is rejected on arrival if it wasn't inspected at origin — and at that point the problem isn't the material, it's the station's schedule. The difference between a supplier and a supply-chain manager shows up exactly here: who owns conformity, and where is it verified?
The approach
We dealt directly with manufacturers in the country of origin rather than buying through an intermediary.
We carried out conformity inspection to Chinese standards before shipment — not on arrival, where rejection becomes a delay in the station's schedule.
We managed the supply chain from mill to site, including shipping, customs clearance, and inland transport.
The outcome
The plates arrived inspected and conforming, contributing to Al-Hartha's generating capacity for the southern region. This project is our documented reference in international supply chain management.
Request this project's completion certificate
We send this project's completion certificate on request for prequalification purposes. And if you have a project of similar scope, send us the bill of quantities or a scope description and we'll come back with a proposal covering specifications, schedule and price.
We reply Sunday – Thursday, 8:00 – 16:00 Baghdad time
Related projects

Building two model schools in Basra city centre
Basra city centre2024
Two model schools with contemporary architectural design, executed in partnership with Chinese firms, with reinforced concrete skeletons and high-efficiency infrastructure.
Project details

Completing infrastructure for new streets at Ifraz 35, Hay Al-Hakim
Ifraz 35, Hay Al-Hakim, Basra2024
Delivering the core infrastructure works for the new streets at Ifraz 35, including sanitation networks, rainwater drainage, GIS mapping systems, and water and electricity extensions.
Project details