Building two model schools in Basra city centre

Two model schools with contemporary architectural design, executed in partnership with Chinese firms, with reinforced concrete skeletons and high-efficiency infrastructure.

Project data

Location
Basra city centre
Completion year
2024
Status
Completed and handed over
Buildings
2 schools
Structural system
Reinforced concrete skeleton
Delivery
In partnership with Chinese firms
Completion certificate
Available on request

The completion certificate is available on request for prequalification purposes.

Site photography

Photographs from the company's own execution on site, documented with date and location.

  • Engineers and workers at the model-schools project board

    The site team at the model-schools project

    Basra Governorate2024

  • Two workers mounting the project board on the site hoarding

    Setting up the model-schools site

    Basra Governorate2024

  • Engineers coordinating on site with the Chinese partner's engineer

    Site coordination meeting with the Chinese partner

    Basra Governorate2024

The challenge

Building two schools in an established city centre means working within tight site constraints, continuous traffic, and existing buried services — while holding to a design specification prepared abroad and coordinating continuously with a foreign partner operating from a different technical reference.

The approach

  • We worked in direct partnership with the Chinese firms on matching design details, rather than passing the specification down to a local equivalent.

  • We executed the reinforced concrete skeletons with quality control and documented lab testing at every pour stage.

  • The infrastructure for both schools was delivered to high efficiency within the same scope.

The outcome

Both schools were completed in 2024. This brought our record in this building type to five schools in two years, all in Basra.

Request this project's completion certificate

We send this project's completion certificate on request for prequalification purposes. And if you have a project of similar scope, send us the bill of quantities or a scope description and we'll come back with a proposal covering specifications, schedule and price.

We reply Sunday – Thursday, 8:00 – 16:00 Baghdad time

Related projects

  • A model-school building under construction, nearing completion

    Building three model schools in Al-Sadiq district, north Basra

    Al-Sadiq district, north Basra2023

    Three model schools with reinforced concrete skeletons and modern architectural design to Chinese specification, handed over complete with HVAC and integrated sanitation.

    Project details

  • Building three model schools in Qurna district, north Basra

    Qurna district, north Basra2023

    Three integrated model schools in Qurna district, executed in partnership with Chinese firms to modern engineering and educational standards, with reinforced concrete skeletons and foundations designed for marshland soil conditions.

    Project details