Building three model schools in Al-Sadiq district, north Basra
Three model schools with reinforced concrete skeletons and modern architectural design to Chinese specification, handed over complete with HVAC and integrated sanitation.
Project data
- Location
- Al-Sadiq district, north Basra
- Completion year
- 2023
- Status
- Completed and handed over
- Buildings
- 3 schools
- Structural system
- Reinforced concrete skeleton
- Design reference
- Chinese architectural specification
- Systems
- Integrated HVAC · integrated sanitation
- Completion certificate
- Available on request
The completion certificate is available on request for prequalification purposes.
Site photography
Photographs from the company's own execution on site, documented with date and location.

Surveying and setting-out
North Basra2023

Pouring the strip footings
North Basra2023

Inspecting the foundation reinforcement
North Basra2023

Column reinforcement cages
North Basra2023

Erecting the column formwork
North Basra2023

Reinforced concrete columns under way
North Basra2023

Power-trowelling the concrete floor
North Basra2023

The model school's concrete frame
North Basra2023

The school building nearing completion
North Basra2023
The challenge
The requirement wasn't three buildings but three usable schools to a non-local design specification — architectural and structural details prepared to Chinese standards, where the local material equivalent won't do, plus conformity in HVAC and drainage, executed simultaneously across three separate sites on one schedule. The common failure on projects like this is handing over the shell and leaving systems to a follow-on contract, so the buildings sit unusable.
The approach
We executed the reinforced concrete skeletons to approved structural drawings, with mix quality control and documented lab testing at every pour stage.
We matched architectural details to the reference specification rather than settling for the locally available substitute; what wasn't available to the required specification was direct-imported with conformity inspection before shipment.
We ran the three sites with parallel crews and a unified supply schedule, so no site stalled waiting on material allocated elsewhere.
HVAC, heating and sanitation were executed within the same scope by our own mechanical team, not as follow-on works.
The outcome
All three schools were handed over in 2023, usable with systems complete. This qualified us to work with Chinese firms on two further model schools in Basra city centre, completed 2024.
Request this project's completion certificate
We send this project's completion certificate on request for prequalification purposes. And if you have a project of similar scope, send us the bill of quantities or a scope description and we'll come back with a proposal covering specifications, schedule and price.
We reply Sunday – Thursday, 8:00 – 16:00 Baghdad time
Related projects

Building two model schools in Basra city centre
Basra city centre2024
Two model schools with contemporary architectural design, executed in partnership with Chinese firms, with reinforced concrete skeletons and high-efficiency infrastructure.
Project details
بانتظار صورة فعلية من الموقع
Building three model schools in Qurna district, north Basra
Building three model schools in Qurna district, north Basra
Qurna district, north Basra2023
Three integrated model schools in Qurna district, executed in partnership with Chinese firms to modern engineering and educational standards, with reinforced concrete skeletons and foundations designed for marshland soil conditions.
Project details